Route 322 & Tomlin Road
Taylor Wiseman & Taylor provided construction plans depicting horizontal/vertical geometrics, drainage design, grading, traffic control staging, right-of-way plans/agreements, wetlands presence/absence plans, traffic signal layout and electrical design, and quantity/cost estimates. TWT also provided the investigation of milling/resurfacing, versus full depth reconstruction, in existing paved areas. Innovative design concepts for this project included an underground detention/infiltration…
Sherman Avenue at the Boulevards
This Federally-funded local aid project included the reconstruction and signalization of two intersections and an at-grade railroad crossing along Sherman Avenue. The unique geometric configuration included two closely spaced parallel roadways, Southeast Boulevard and Southwest Boulevard, which are separate by a Conrail rail line, all of which intersect with Sherman Avenue. Taylor Wiseman & Taylor…
Services
- Land Surveying
- Site/Civil Engineering
- Transportation Engineering
- Highway Design
- Roadway & Intersection Design
- Bridge Design & Inspections
- Geotechnical Engineering
- Asset Management / GIS Development & Data Collection
- ROW Engineering
- Traffic Engineering & Signal Design
- Conceptual Development
- Roadway Resurfacing & Reconstruction
- Environmental Permitting
- Highway Lighting Design
- Traffic Studies
- Subsurface Utility Engineering
- Environmental Geology
- Infrastructure Design & Analysis
- Geospatial Services
- Construction Inspection Services