• Focused on the Future, Built on Tradition,
    Committed to Excellence... Since 1901

  • Focused on the Future, Built on Tradition,
    Committed to Excellence... Since 1901

Topographic Surveys

Laurel Green Phase 3

Laurel Green Phase 3 is a significant site/civil engineering project located at 203 Ark Road, Mt. Laurel, NJ. This development includes four apartment buildings comprising a total of 108 units, designed to connect with the existing residential complex and enhance its amenities. The project, with an estimated cost of approximately $2.19 million, involves comprehensive services...

Kean University EV Charging & Parking Lot Design

Kean University in Morris County, NJ, engaged Taylor Wiseman & Taylor (TWT) through Concord Engineering to assist with the design of new ADA-accessible electric vehicle (EV) charging stations and the regrading of various parking lots to improve drainage. This project demonstrated TWT's ability to integrate innovative geospatial technology with precise engineering solutions to meet the...

Beach Fill MEC Project

During beach replenishment operations in the Winter of 2006-2007, dredge materials were placed in the beach area of Ship Bottom and Surf City, NJ. It was subsequently discovered that unexploded ordinance (UXO) had been deposited in these beach areas during the dredging operation. Under the direction of the client and the USACOE, Taylor Wiseman &…

Valero Pipeline – Buckeye

The project included performance of boundary surveying, topographic surveying and parcel mapping, including easement plans, for a 1.1-mile pipeline project for Valero LP at their Linden NJ facility as a sub-consultant to CH2M-Hill. This project also consisted of centerline staking, construction staking and As-Built Surveys. The project links two sites with numerous constraints requiring detailed…

© Taylor Wiseman & Taylor | Website by Burlington Press