Laurel Green Phase 3
Laurel Green Phase 3 is a significant site/civil engineering project located at 203 Ark Road, Mt. Laurel, NJ. This development includes four apartment buildings comprising a total of 108 units, designed to connect with the existing residential complex and enhance its amenities. The project, with an estimated cost of approximately $2.19 million, involves comprehensive services...
S.R. 3020 Section 651 Over Inlet to Lake Quinn Bridge Replacement
Located in South Canaan Township, Wayne County, Pennsylvania, the S.R. 3020 bridge replacement project was a significant endeavor aimed at enhancing transportation safety and infrastructure resilience. The previous structure was replaced with a state-of-the-art single-cell precast concrete box culvert, designed to handle a 25-year storm event, which previously caused roadway flooding. Key challenges included streambank…
S.R. 3018 Section 650 Bridge Replacement
The S.R. 3018 Section 650 bridge replacement project, located in South Canaan Township, Wayne County, Pennsylvania, is a significant infrastructure upgrade executed for PennDOT. This project involves replacing a structurally deficient bridge over Branch Middle Creek with a new Integral Abutment Bridge featuring spread box beams. The new structure is designed to handle a 25-year…
Hanover Gas Main Replacement
Taylor Wiseman & Taylor provided surveying, environmental and civil design services for replacement of eight miles of existing natural gas transmission main. The main delivers gas from a Texas Eastern Gate Station, and is a major supplier to the New Jersey Natural Gas Northern Division in Morris County. The gas main runs through rough terrain…
Pohatcong Lake Dam Replacement & Roadway Reconstruction
TWT provided design services to replace the existing primary spillway and discharge structure on heavily-traveled Route 9 in Tuckerton, NJ, and to upgrade the dam to comply with current NJDEP DSS regulations. The project included relocating the primary spillway some 300 feet west of the existing, construction of a 151-foot long semi-circular, two-stage concrete ogee-shaped…