Moorestown Mall

Concurrent with renovation of the Moorestown Mall, the owner constructed site improvements to support and enhance the building modifications.

Taylor Wiseman & Taylor was engaged by the general contractor to designate, locate and map all existing utilities on the 85-acre site. Prior records or plans for the site were not available, so various types of electromagnetic, sonic and geophysical techniques were used in the field to determine the existence and approximate horizontal location of the facilities.

After completion of the designating phase, 170 test holes were excavated utilizing our vacuum excavation vehicle to locate various utilities. Over 130,000 lineal feet of existing utilities, including water, sanitary sewer, storm sewer, gas, electric and communications lines were located and mapped. The results were used for the final design and relocation of the storm and sanitary sewer system.

Construction of the new utilities and other site improvements was completed without conflicts with existing facilities or any damage to existing utilities.