• Focused on the Future, Built on Tradition,
    Committed to Excellence... Since 1901

  • Focused on the Future, Built on Tradition,
    Committed to Excellence... Since 1901

Estech Chemical Site Remediation

The scope of work for this project included the following:

  • Topographic Survey of approximately 28 acres of uplands and 5 acres of marsh land
  • Bathymetric Survey of nearly 1000 linear feet of the Cape Fear River shoreline. Cross-sections were carried from the top of bank to the deepest point of the river channel.
  • Establishment of survey control points throughout the project area that were tied to the NC State Plane Coordinate System
  • Records research & GIS-grade property mapping of the subject property and adjoiners
  • Monitoring Well Locations
  • Wetlands mapping
  • TWT field personnel were all OSHA 40-hour HAZWOPER
  • Work was performed in accordance with Loss Prevention System (LPS) awareness training. Daily tailgate safety meetings were performed.
  • Submittal of AutoCAD drawings
© Taylor Wiseman & Taylor | Website by Burlington Press