Taylor Wiseman & Taylor provided engineering design and surveying services for Final Scope Development, Preliminary and Final Designs, and Construction Engineering Services for roadway widening and safety improvements along ¾ of a mile of Route 33, and ¼ mile each along Routes 35 and 71. Based on input from the NJ Department of Transportation (NJDOT),…
Taylor Wiseman & Taylor provided engineering design and surveying services for Preliminary Design through Construction Consultation for this $12M highway project that focused on operational and safety improvements. Our design efforts included 1.7 miles of roadway widening, intersection improvements, two new bridges over Mantua Creek, drainage improvements, utility relocations, two closely-spaced traffic signals connected to…