• Focused on the Future, Built on Tradition,
    Committed to Excellence... Since 1901

  • Focused on the Future, Built on Tradition,
    Committed to Excellence... Since 1901

Bridge Design and Inspections

Route 9 Over Main Street Bridge Replacement

Taylor Wiseman & Taylor (TWT) provided complete Design Services for the replacement of the existing superstructure, and much of the substructure, of the Route 9 Bridge over Main Street (CR 514). The average traffic volumes on Route 9 exceed 50K vehicles per day. The Bridge, constructed in 1937, consisted of a concrete-encased steel beam main…

SR 87-754 Over Mehoopany Creek Bridge Replacement

The Mehoopany Bridge project included the re-alignment of SR 87 and the construction of a new bridge over Mehoopany Creek. TWT was responsible for the extensive Hydrology and Hydraulic Analysis of the Mehoopany Creek and Watershed, as well as the design of the replacement structure. The Mehoopany Watershed encompasses approximately 122 square miles. One of…

© Taylor Wiseman & Taylor | Website by Burlington Press