• Focused on the Future, Built on Tradition,
    Committed to Excellence... Since 1901

  • Focused on the Future, Built on Tradition,
    Committed to Excellence... Since 1901

Valero Pipeline – Buckeye

The project included performance of boundary surveying, topographic surveying and parcel mapping, including easement plans, for a 1.1-mile pipeline project for Valero LP at their Linden NJ facility as a sub-consultant to CH2M-Hill. This project also consisted of centerline staking, construction staking and As-Built Surveys. The project links two sites with numerous constraints requiring detailed reporting of existing conditions.

Obstacles to be resolved included numerous existing underground utilities, multiple railroad right-of-way crossings and a crossing under the New Jersey Turnpike (400’ right-of-way). This project consisted of two (2) HDD’s directional drilling on a long spanning width of the New Jersey Turnpike and one (1) jack and bore under the Conrail right-of-way and tracks.

© Taylor Wiseman & Taylor | Website by Burlington Press