• Focused on the Future, Built on Tradition,
    Committed to Excellence... Since 1901

  • Focused on the Future, Built on Tradition,
    Committed to Excellence... Since 1901

Environmental Permitting

Pohatcong Lake Dam Replacement & Roadway Reconstruction

TWT provided design services to replace the existing primary spillway and discharge structure on heavily-traveled Route 9 in Tuckerton, NJ, and to upgrade the dam to comply with current NJDEP DSS regulations. The project included relocating the primary spillway some 300 feet west of the existing, construction of a 151-foot long semi-circular, two-stage concrete ogee-shaped…

Route 183 NJ Transit Bridge and Netcong Circle Replacement

Route 183 is a two-lane roadway and bridge that crosses NJ Transit’s railroad tracks. This bridge was substandard and in poor condition. Netcong Circle comprises the intersection of Routes 183 and 46, and it features another bridge that carries Route 46 westbound over Route 183 southbound. Based upon safety concerns, it was determined that both…

© Taylor Wiseman & Taylor | Website by Burlington Press