• Focused on the Future, Built on Tradition,
    Committed to Excellence... Since 1901

  • Focused on the Future, Built on Tradition,
    Committed to Excellence... Since 1901

Bridge Design & Inspections

Pencoyd Bridge

Taylor Wiseman and Taylor (TWT) provided complete Design Services for the rehabilitation of the existing three-span steel bridge over the Schuylkill River that connects Lower Merion and Manayunk, PA. The structure, originally built in 1900 as a railroad bridge, consists of two 183-foot truss spans and one built-up through-plate girder span. The plate girder span…

Maple Avenue Bridge

Taylor, Wiseman & Taylor (TWT) was selected by the New Jersey Department of Transportation (NJDOT) to perform preliminary, final and construction engineering services for the replacement of the 100-year old Maple Avenue (CR 642) Bridge over the NJ Transit Atlantic City Rail Line. The existing bridge was constructed around 1900 by the Delaware River Railroad…

© Taylor Wiseman & Taylor | Website by Burlington Press